Pani Productions
A busy exhibition floor with branded booths from camera and electronics makers

Exhibition stall design in BangaloreThree seconds as they walk past. That is the whole brief.

Custom booths for trade shows at BIEC and KTPO — designed to stop the right visitor, approved by the organiser on time, built clean and handed over before the doors open.

Producing large-format events since 2018Bangalore · Goa · KeralaOne producer, start to finish

Get a costed plan

Three details. A producer calls you back with options and a ballpark.

A producer replies on WhatsApp or email within one working day. No spam, no sales sequences.

The short answer

How long does a custom exhibition booth take to build?

A custom exhibition booth typically takes three to six weeks from design to handover: design and sign-off, organiser approvals, fabrication and finishing, then the build on site during the venue’s setup days. Size, materials and the organiser’s submission deadlines set the real timeline, so start from the deadline and work backwards.

At BIEC on Tumkur Road and KTPO in Whitefield, your booth sits in an aisle with dozens of others, and the visitor decides in a few steps whether to stop. What matters is not the most expensive build but the clearest one: one message readable from the aisle, a reason to step in, and a place to have a real conversation. We design for that, manage the build with fabrication partners, and stand on the floor through setup.

What keeps event owners up at night

Expo failures are public. Your competitor is in the next aisle.

  • The booth is still being built at opening.Fabrication slips, then setup days run out. We plan from the organiser’s build window, not from the design date.
  • The organiser rejects the drawing.Height limits, rigging rules and fire norms differ per show. Drawings go in early and are built to what was approved.
  • The screen has no power.Power orders are placed with the organiser, separately and early. We list every load before the order deadline.
  • The booth looks great and nobody stops.Too many messages and a closed front. One line, open sides and a demo or conversation point fix most of this.
Guests talking in small groups at a corporate networking event
What we take off your plate

From the floor plan to the handover walk

  • Booth concept, 3D visuals and construction drawings
  • Organiser submissions: drawings, rigging, power and safety forms
  • Fabrication management, quality checks and finishing
  • Graphics, LED screens, lighting and demo stations
  • Furniture, storage, meeting corner and product display
  • On-site supervision through build, show days and dismantle
  • Booth staff briefing, lead capture and visitor flow
  • Photography of the booth and the show floor
BIEC exhibition and KTPO Whitefield events

Bangalore’s two big exhibition venues

Most trade shows in Bangalore happen at one of these two. Both are listed figures; the organiser of your show sets the floor plan.

VenueAreaListed spaceTypical shows
Bangalore International Exhibition Centre (BIEC)Tumkur Road5 halls, 77,200 sq m of covered exhibition space, plus a convention centreLarge industry and technology expos
KTPO Trade CentreWhitefieldAC hall ≈5,371 sq mExpos and trade fairs near the eastern IT corridor

Sources: BIEC, Wikipedia, Spalba. Figures are listings; confirm the hall and plot with your show organiser.

Exhibition space cost

What BIEC charges — and who pays it

BIEC publishes its hall rates. These are what the show organiser pays BIEC. As an exhibitor you buy your booth space from the organiser at their own price.

BIEC item (organiser-level)Rate (plus taxes)
Exhibition space, show days₹265 per sq m per day
Exhibition space, setup and dismantle days₹138 per sq m per day
Air-conditioning₹3.45–5.75 lakh per hall per day
Stage (convention centre)₹75 per sq ft

Source: BIEC rate card, April 2025–March 2026 — the latest card we found. Useful context for organisers and for judging what a show’s booth price includes.

Booth build timeline

Three to six weeks, worked backwards from the show

  1. 6 weeks out

    Exhibitor brief, plot size and position from the organiser, the exhibitor manual read for height and rigging rules.

  2. 5 weeks out

    Concept and 3D visuals. One round of changes. Budget locked against the design.

  3. 4 weeks out

    Construction drawings to the organiser. Power, internet and rigging orders placed.

  4. 3–2 weeks out

    Fabrication. Graphics files finalised. Mid-build check at the workshop.

  5. Setup days

    Booth built on site within the venue’s build window. Power and screens tested. Snag list closed.

  6. Show and dismantle

    Daily touch-ups and on-call support; dismantle and removal inside the organiser’s window.

What an exhibitor brief needs

Ten things to send your booth designer

The better the brief, the fewer rounds of design — and the fewer surprises on setup day.

  • Show name, venue, hall and dates, including setup and dismantle days
  • Plot size, stand number and how many sides are open
  • The organiser’s exhibitor manual — height limits, rigging, fire and power rules
  • The one message the booth must carry, readable from the aisle
  • Products to display or demo, with sizes, weights and power needs
  • Meeting needs: how many private conversations at once, storage, a lockable area
  • Brand guidelines and any graphics already approved
  • Who staffs the booth, and how you will capture leads
  • Budget range, and whether the booth should be reused at later shows
  • One decision-maker for design sign-off
Exhibition booth design ideas

What makes a booth work on a busy floor

One line, big

One message at eye height and one at the top for the far aisle. Logos alone do not stop anyone.

Open the front

Remove the counter barrier. Put the product or demo at the aisle edge, not at the back wall.

Light it

Halls are flat-lit. Your own lighting makes the booth look finished and photographs well.

A reason to stop

A live demo, a short experience or a sample — something that takes thirty seconds.

A place to talk

A quieter corner or a closed meeting room for the conversation that leads to an order.

Build to reuse

Modular frames and swappable graphics bring down the cost of the next show.

Method

How a Pani Productions event runs

  1. Brief & ballpark

    A 30-minute call with your event owner. You get a format, venue shortlist and an itemised cost range you can take upstairs.

  2. Venue & concept

    We check dates, layouts and rooms with venues, run a site recce, and build the creative: theme, stage, content flow.

  3. Production plan

    Stage, LED, sound and light specified and drawn. Delegate logistics, rooming lists, transfers and F&B locked to a master timeline.

  4. Rehearsals

    Technical rehearsal and a cue-to-cue run with presenters. Backup power, spare mics and playback files ready before doors open.

  5. Show day

    One show caller on headset runs every cue. Your team hosts; nobody from your side should have to carry a radio.

  6. Close-out

    Reconciled invoice against the estimate, vendor settlement, photos and a short debrief on what to repeat next year.

FAQ

Questions people ask before they book

How long does a custom booth take to build?
Typically three to six weeks for design, approvals and fabrication, depending on size and the organiser’s deadlines. Start from the organiser’s drawing submission date and work backwards.
What does exhibition space at BIEC cost?
BIEC’s April 2025–March 2026 card lists ₹265 per sq m per day during the show and ₹138 per sq m per day for setup and dismantle, plus air-conditioning (₹3.45–5.75 lakh per hall per day) and taxes (BIEC rate card). That is what organisers pay; exhibitors buy booths from the organiser.
Do you design booths for shows at KTPO Whitefield?
Yes — KTPO and BIEC are Bangalore’s two main exhibition venues. The process is the same: read the exhibitor manual, submit drawings early, build inside the setup window.
Are you exhibition organisers in Bangalore?
We work on the exhibitor side — booths, activations, launches and hospitality at a show — and on company-run expos such as dealer or partner exhibitions alongside a conference.
Can a booth be reused at the next show?
Yes, if it is designed for it: modular frames, swappable graphics and storage between shows. It costs more the first time and less every time after.
What should we do at the booth to get leads?
Give visitors a reason to stop — a demo or short experience — brief the booth team on two qualifying questions, and capture leads digitally with consent so they reach sales the same day.
The brief

Tell us about the event

Rough is fine. Headcount, a city, a month. We come back with venue options, a format and a cost range you can take to your leadership — before you commit to anything.

  • Itemised estimate: venue, food, production, logistics and our fee as separate lines
  • Venue options checked for your date, headcount and layout
  • GST invoicing for your finance team

Rather talk? +91 77669 40021 · WhatsApp · info@paniproductions.com

A producer replies on WhatsApp or email within one working day. Your details go only to the Pani Productions team.

WhatsAppPlan my event